LETTER: Repair the dam for Grafton’s sake and health of the river

To Ozaukee Press:

At the heart of Grafton is the dam. It‘s more than concrete and steel—it’s a vital public asset that protects the upper waterways of Wisconsin while benefiting us, businesses and visitors alike.

According to the Wisconsin Departsment of Nastural Resources and the U.S. Fish and Wildlife Service, this 20-foot-high dam is the first complete barrier to aquatic invasive species on the Milwaukee River, protecting more than 80 miles of upstream habitat and fisheries from sea lampreys which are in Lake Michigan.

Jessica Barber, of the Fish and Wildlife

Service, stated, “The entire river system could require pesticide treatments every three to four years at an estimated cost of over $300,000 per treatment.”

Preserving this structure means protecting the ecological health of waterways far beyond Grafton.” She also stated that her agency and the Great Lakes Fishery Commission are against the removal of our dam.

The DNR required us to install a hydraulic gate for flood-control management while allowing the dam to remain. This May, when a piston failed, the gate became inoperable. Repairing the gate is essential — to restore its intended function and to keep the function of the dam as a barrier.

Fixing the gate, preserving the dam and protecting the environment do not have to be opposing goals. Responsible maintenance, repairing the gate and removing accumulated sediment can improve water quality and habitat while preserving the dam’s role.

And, yes, its millpond creates the scenic views that attract visitors to our downtown. People come to walk along the river, fish, kayak, photograph wildlife and enjoy our parks. These activities support local businesses and contribute to Grafton’s economy.

The decision before us is not only whether to repair a gate. It is whether we will preserve an important dam that protects our upstream waterways, supports recreation and strengthens our local economy. If gone, it will never be restored. Repairing the gate is an investment in environmental stewardship and the future of Grafton.

I encourage our elected officials to act promptly, repair the hydraulic gate and preserve this valuable public asset for future generations and the prosperity of Grafton.

Erin Blum

Grafton

Feedback:

Click Here to Send a Letter to the Editor

Ozaukee Press

Wisconsin’s largest paid circulation community weekly newspaper. Serving Port Washington, Saukville, Grafton, Fredonia, Belgium, as well as Ozaukee County government. Locally owned and printed in Port Washington, Wisconsin.

125 E. Main St.
Port Washington, WI 53074
(262) 284-3494
 

CONNECT


User login