School construction nears finish line


It still is a construction site (top photo), but the new cafeteria and other construction at the Northern Ozaukee School District campus will largely be finished in time for the upcoming school year. A rendering from Bray Architects (bottom) shows what the cafeteria will look like. Students, staff and residents will get a chance to tour the school during the annual NOSD Back to School Picnic, scheduled for the evening of Tuesday, Aug. 27. Photo by Sam Arendt

Category:

Feedback:

Click Here to Send a Letter to the Editor

Ozaukee Press

Wisconsin’s largest paid circulation community weekly newspaper. Serving Port Washington, Saukville, Grafton, Fredonia, Belgium, as well as Ozaukee County government. Locally owned and printed in Port Washington, Wisconsin.

125 E. Main St.
Port Washington, WI 53074
(262) 284-3494
 

CONNECT


User login